The 2018 collapse of a bridge in northwestern Italy that killed 43 folks was a results of issues within the construction’s conception, design, building and, extra lately, upkeep that led to corrosion in some metal cables that finally snapped, in response to an impartial report that was made public on Monday.

With a trial anticipated to begin subsequent yr, the report will play an important position within the prosecutors’ effort to convey a big selection of figures to account for the lethal collapse of the 51-year-old Morandi Bridge, in Genoa, which was as soon as heralded as a logo of Italian innovation and artistry however is now seen as a warning in regards to the degradation of the nation’s ageing infrastructure.

“If, in any of these phases, the proper checks were made, it was highly likely that they could have prevented the tragedy,” the report seen by The New York Times learn. “The lack and/or the inadequacy of the checks are the weak link in the system.”

The sweeping, 467-page paper, which was commissioned by a choose, was a milestone within the prosecutors’ complicated investigation into the reason for the tragedy, which befell on a summer season morning when the cables broke, taking down the deck as dozens of automobiles had been crossing.

“This is an important piece to seek the truth,” Egle Possetti, spokeswoman for a bunch of the victims’ households, mentioned in an announcement. “It is very sad, but it is finally a clear confirmation that all this could be avoided. Our loved ones were killed. None can go back in time, but we can keep fighting with firmness and determination for the truth to emerge.”

Officials from the bridge operator, Autostrade per l’Italia, and from its engineering department, in addition to plenty of high-ranking civil servants with the Italian Infrastructure and Transport Ministry are anticipated to go on trial in reference to the bridge collapse.

Both the Infrastructure and Transport Ministry and Autostrade declined a request for touch upon the report.

Some of the findings from the engineers and from physics specialists confirmed earlier experiences in regards to the bridge collapse, however in addition they dominated out a few of the theories that had been raised by Autostrade as potential causes of the tragedy, just like the motion of the wind and the autumn of a heavy metal coil from a truck that was on the bridge when it collapsed.

The report’s authors established that the set off for the collapse was the corrosion of the cables on the highest of the southern keep of one of many towers, which began shortly after the bridge got here into service and “progressed with no rest until the bridge collapsed,” the specialists wrote.

The bridge’s operator by no means carried out the thorough assessments on its stays that had been recommended by its designer, the engineer Riccardo Morandi, in 1985, the report mentioned.

Mr. Morandi was conscious that a few of the metal cables had been weak to corrosion and that some errors had been made through the difficult building of such a peculiar bridge, in response to notes he made on the time, now collected within the State Archive of Rome.

The bridge featured three slender, A-frame towers, paired with 12 stays — helps that prolonged from the towers and mounted to the edges of the roadway. In his notes, Mr. Morandi was additionally involved in regards to the long-term dangers related to the situation of the bridge, crossing a valley in Genoa that left it uncovered to the salty winds blowing off the ocean and to the chemical compounds coming from a close-by industrial website.

The bridge was final retrofitted within the early Nineties, when the construction was managed by a state-controlled operator.

The restoration didn’t embrace the tower the place the corroded cables would spark off the collapse 20 years later, however engineers inspected it and detected issues with the concrete’s water resistance.

The engineers recommended annual upkeep, however, in response to the report, the subsequent inspection didn’t come till 2012, and the investments wanted for a correct retrofit had been nonetheless being mentioned the yr the bridge collapsed. By that point, the Morandi Bridge, like about half of Italy’s highways, had handed to the administration of a non-public firm, Autostrade per l’Italia.

“The operator should have had an adequate knowledge of the work as it was actually built,” the report mentioned.

Experts argue that engineers may have seen and forecast the collapse if the correct investigation had been carried out on the tower and its defective stays.

Last yr, Autostrade overhauled its administration and carried out a brand new inspection system as a part of an settlement with the Infrastructure Ministry and with the assistance of worldwide specialists, and it’ll make investments billions in sustaining the nation’s highways.